provide and Average Cost Curve Diagram to sketch the long-run AC curve and the short-run SATC, SAVC and SAFC curves at q = 0, q = 2, and q = 4.

ECO 100 Workbook Summer 2014 Problem 2

ECO 100 Workbook Summer 2014 Problem 2

Question

A firm that is operating with production function q = K0.25L0.25 has mrts = K/L and hires labour for w = 1.00 and capital for r = 0.25.

  1. a) Construct an Isoquant Diagram to illustrate how this cost minimizing firm would produce q = 2 units of output as bundle “a”, how the firm would implement a short-run increase in output to q = 4 units when capital is fixed at the level chosen for q = 2 as bundle “b” and how this firm would implement a long-run increase in output to q = 4 when capital in not fixed as bundle “c”
  2. b) Provide a Total Cost Curve Diagram to sketch the long-run total cost C = C(q, w, r) and short-run total cost SC = SC(q, K, w, v) curves at q = 0, q = 2, and q = 4.
  3. c) Underneath the total cost curve diagram provide and Average Cost Curve Diagram to sketch the long-run AC curve and the short-run SATC, SAVC and SAFC curves at q = 0, q = 2, and q = 4.

 

. TODAY AND GET AN AMAZING DISCOUNT

get-your-custom-paper

The post provide and Average Cost Curve Diagram to sketch the long-run AC curve and the short-run SATC, SAVC and SAFC curves at q = 0, q = 2, and q = 4. appeared first on Term Paper Tutors.