Structural Engineering

Problem 1: Go to Pullman Building Supply and look at the building structure. Describe the load path for the loads (dead, live, and roof live) to go from the roof to the foundation.

Problem 2: Go to the second floor of the Paccar building and look at the high-bay testing lab structure (look through the second-floor glass wall). Describe the load path for the loads (dead, and live) to go from the crane to the foundation.

Problem 3: Go to Safeway and look at the building structure. Describe the load path for the loads (dead, live, and roof live) to go from the roof to the foundation.

You can google the building name to see the out side picture of it and answer the questions. Problem 2 can be ignored.